20ft Shipping Container
Approx. 33.2 m³
The standard 6.06 m ISO dry container: 33.2 m³ of volume, up to 28 t of payload, and the easiest size to move by road almost anywhere in the world.
Europe
The shortest road legs and the deepest depot stock in Europe — Rotterdam is on the doorstep of every Dutch delivery address.

The Netherlands is the easiest country in Europe to deliver a container into. Rotterdam holds the largest concentration of container equipment on the continent, road distances are short, and available stock is dense enough that the origin is rarely more than a couple of hours from the destination.
That shows up in two ways: a smaller transport component in the delivered price, and a wider choice of grades and types available on any given week.
Because the road leg is short, the container price dominates the quotation — which means grade selection is where the money is. Buying cargo worthy when wind and watertight would do costs more here proportionally than in a country where transport swamps the difference.
The other consequence is choice. If a specific type, colour or condition is not available this week, waiting a short period is often worthwhile in the Dutch market in a way it is not elsewhere.
Dutch sites are frequently constrained by soft ground and by narrow access rather than by distance. Say on the RFQ whether the standing position can take a loaded delivery vehicle — where it cannot, a crane truck placing the unit from a hard access road is the standard answer.
The container and the transport are one movement, so both are decided against the same thing: where the unit has to end up.
You give us the endpoint and the specification. The postcode does more work here than anything else on the enquiry.
Suitable availability is assessed against that destination rather than against a fixed origin, because the unit that is cheapest at the depot is not always the cheapest on your site.
The vehicle is chosen by what the site can physically take.
Container plus transport plus whatever the access requires, with what is included and what is excluded both stated.
A lower-priced unit sitting further from you can end up more expensive once the road leg is added, and the gap is often larger than the difference in the container price. Supply is therefore selected against the final destination rather than against the headline figure — which is also why we quote delivered rather than ex works by default.
Both are supplied to every market we quote. The choice is about what the container has to do once it arrives.
Distance is rarely what complicates a European delivery. The last hundred metres is. These four questions decide the vehicle, and the vehicle decides a meaningful part of the price.
Can an articulated vehicle reach the placement point? Gate width, road width and any weight or width restriction on the approach.
A tilt-bed needs room to reverse and to slide the container off — as a guide, its own length again behind it.
Tilted off by the vehicle, lifted by a crane truck, or unloaded by equipment you provide. This is the single biggest variable.
Level, firm and able to carry the corner loads. Soft ground and slopes are what turn a delivery into a return journey.
Five things. Anything you do not know yet can be marked provisional — a rough quantity is more useful than a blank.