22P1
Platform Containers for Sale
A bare ISO deck with corner castings and nothing else — no ends, no sides, no roof — for the heaviest and most awkward cargo.
- External length
- 6 058 mm
- Payload
- 31 260 kg
A platform container is a flat rack reduced to its deck. There are no end frames, no sides and no roof: just a reinforced steel bed with ISO corner castings so it can be handled, stacked and secured by standard container equipment.
It is the most specialised type in the catalogue and the least frequently traded. It is bought when cargo has to overhang in every direction, or when it must be loaded and lashed with completely unobstructed access from all four sides.
Technical specifications
| Property | 20ft Platform22P1 | 40ft Platform42P1 |
|---|---|---|
| External dimensions | ||
| Length | 6 058 mm19 ft 10.5 in | 12 192 mm40 ft |
| Width | 2 438 mm8 ft | 2 438 mm8 ft |
| Height | 370 mm1 ft 2.6 in | 648 mm2 ft 1.5 in |
| Internal dimensions | ||
| Length | 6 058 mm19 ft 10.5 in | 12 192 mm40 ft |
| Width | 2 438 mm8 ft | 2 438 mm8 ft |
| Height | — | — |
| Weights | ||
| Tare weight | 2 740 kg6 040 lb | 5 700 kg12 570 lb |
| Maximum gross mass | 34 000 kg74 960 lb | 45 000 kg99 210 lb |
| Payload | 31 260 kg68 920 lb | 39 300 kg86 640 lb |
Construction & fittings
- ISO type codes
- 22P1 / 42P1 and related P-series codes
- Structure
- Reinforced steel deck, ISO corner castings, no ends or sides
- Deck height
- Low — approx. 370 mm (20ft); 40ft units have a raised end section
- Lashing
- Deck rings only; no end frames to brace against
- Availability
- Limited European depot stock; sourced to requirement
- Load rating
- Varies by design — CSC plate and load diagram govern
When a platform beats a flat rack
Only when the end frames are genuinely in the way. Flat rack end frames are useful — they take longitudinal lashing loads and give the cargo something to brace against — so a platform is the right answer only for cargo that is longer than the deck, or that must be craned and slung with clear access along the full perimeter.
Because there is nothing to brace against, the lashing plan carries the whole job. Expect the carrier to require a documented securing arrangement, and budget for the labour and materials to execute it.
Availability
Platforms are a small fraction of the global fleet and depot stock in Europe is thin. Lead times are longer than for any other type here and units are frequently sourced against a specific requirement rather than off the shelf. Give us the cargo dimensions, weight and intended route as early as possible.
Typical uses
Over-length cargo
Very heavy single items
Project cargo
